Industrial Equipment MFG Unit For Asset Sale Bharuch
About Business
The business is involved in the manufacturing of industrial process equipment used in drying systems, evaporation systems, and liquid waste treatment applications. The unit has been developed for fabrication and engineering activities related to process industries such as chemicals, pharmaceuticals, food processing, and industrial manufacturing.
Location
The manufacturing facility is situated in an industrial area of Bharuch, Gujarat. The location offers access to industrial utilities, transportation connectivity, and infrastructure suitable for engineering and fabrication operations.
Manufacturing Setup
The unit is equipped with machinery and equipment required for fabrication, welding, machining, cutting, rolling, and material handling activities. The setup is suitable for industrial equipment manufacturing and heavy fabrication work.
Machinery & Equipment
Welding Equipment
- TIG / ARC Welding Machines – 14 Units
- Arc Welding Rectifiers – 2 Units
- Gas Cooled TIG Welding Machine – 1 Unit
Grinding & Finishing Equipment
- 7” Angle Grinders – 5 Units
- 5” Angle Grinders – 12 Units
- Straight Grinders – 2 Units
- Bench Grinder – 1 Unit
- Flexible Shaft Grinders – 2 Units
- Polishing Machines – 2 Units
Cutting & Fabrication Equipment
- Plasma Cutting Machine – 1 Unit
- CNC Plasma Cutting Machine – 1 Unit
- Band Saw Machine – 1 Unit
- Shearing Machine – 1 Unit
Rolling & Forming Machines
- Rolling Machines – 4 Units
- Channel Rolling Machine – 1 Unit
- Spinning Machine – 1 Unit
- Grooving Machine – 1 Unit
- Bending Machine – 1 Unit
- Geared Rollers – 2 Units
Machining Equipment
- Drilling Machines – 5 Units
- Milling Machine – 1 Unit
- Tapping Machine – 1 Unit
- Lathe Machines – 2 Units
- Slotting Machine – 1 Unit
Utility Equipment
- Air Compressor – 1 Unit
- Diesel Generator – 1 Unit
Material Handling Equipment
- Pallet Trucks – 2 Units
- Single Cylinder Trolleys – 4 Units
- Double Cylinder Trolleys – 2 Units
Total Equipment
- More than 75 machines and industrial equipment units are available at the facility.
E.O.T. Crane Infrastructure
The plant includes multiple E.O.T. cranes installed for the movement and handling of heavy industrial components within the manufacturing area.
- 20T / 5T X 16 Meter Span – 1 Unit
- 15T / 5T X 16 Meter Span – 1 Unit
- 5T X 16 Meter Span – 1 Unit
- 7.5T X 4.381 Meter Span – 1 Unit
- 5T X 4.381 Meter Span – 1 Unit
- 3T X 4.381 Meter Span – 1 Unit
Utilities & Infrastructure
- Industrial Power Connection – 100 KW
- Water Supply Connection – 12 Cubic Meter Per Day
- DG Backup System – 125 KVA / 100 KW Capacity
- Rooftop Grid Connected Solar System – 66 KW
Transaction Opportunity
The owners are looking to sell the machinery, equipment, and industrial assets of the manufacturing unit. The setup may be suitable for fabrication companies, engineering businesses, industrial manufacturers, or investors looking for an operational industrial facility with installed infrastructure.
Clientele type
It's a running plant, catering to local and international clients.
Premises
Land & Infrastructure Details
- Total Industrial Plot Area – 9,252.57 Sq. Mts.
- Combined Industrial Plot Area – 18,504 Sq. Mts.
Parking & Common Open Space
- Required Parking Area (10% of Plot Area) – 925.25 Sq. Mts.
- Parking Area Provided – 937.75 Sq. Mts.
- Required Common Open Space (8% of Plot Area) – 740.20 Sq. Mts.
- Common Open Space Provided – 744.07 Sq. Mts.
Permissible Construction Area
- Permissible Ground Floor Built-up Area (50% of Plot Area) – 4,626.28 Sq. Mts.
- Permissible FSI @ 1.20 – 11,103.08 Sq. Mts.
Existing Built-up Area
- Ground Floor Built-up Area – 3,765.56 Sq. Mts.
- First Floor Built-up Area – 188.78 Sq. Mts.
- Total Constructed Area – 3,954.34 Sq. Mts.
Facility Infrastructure
- The existing infrastructure includes workshop areas, storage sections, office space, and security cabin facilities constructed within the industrial premises.
Asking Price Includes
The transaction includes the complete industrial setup comprising land, building, machinery, equipment, and related assets.
Reason
The management is planning to relocate the manufacturing operations closer to its primary operational base due to location and operational management considerations.
Keywords
Business Tags
Business Exit for ₹10 Cr – 200 Cr
Structured Transition Completed in 120 Days
Credible Buyer Connections, Confidential Discussions, and Seamless Closure
Supported by Advisors with 26+ Years of Experience